EEG COLLECTION and 1 to 19
CHANNEL
Z SCORE NEUROFEEDBACK MODULES
CLICK HERE TO
VIEW A VIDEO DEMO OF Z SCORE BIOFEEDBACK
CLICK
HERE TO DOWNLOAD DOCUMENTATION ON EEG COLLECTION & 1 to 19 CHANNEL Z SCORE
NEUROFEEDBACK MODULES
Download
Video Files for the NeuroGuide Multimedia Player
Video of
Introduction to Z Score Biofeedback By Robert Thatcher,
Ph.D.
Technical
Details of Z Tunes and Neuroimage Biofeedback
Click
Here to Download Additional Documentation
Seamlessly collect and analyze
EEG
Data using the NeuroGuide Collection Module. NeuroGuide can acquire
EEG from the
BrainMaster Discovery amplifier, the
Deymed
amplifier,
the NeuroPulse/Mindset
amplifier and
Mitsar then seamlessly Activate NeuroGuide for
detailed Normative Database Analyses. Visit the
BrainMaster, Inc.
and/or
NeuroPulse-Systems, LLC and
Mitsar
and Deymed, Inc. websites for
technical specifications. Save Time and Effort with
Seamless Acquisition, QEEG Analysis and Neurofeedback.
Z Tunes - Gaussian
Adaptive Biofeedback
Stand alone Acquisition Module
(NGA): Monitor, Record, Pause/Review and Stop Functions include the ability to change the display montage. Review and Save in .ng
and EDF format for post-hoc analyses
($1000). The
module currently operates with Neuropulse/Mindset24, Deymed, Mitsar, Nexus and BrainMaster
Discovery amplifiers. For
satellite acquisition and/or Neurofeedback purchase the
NGA
product that is independent of Neuroguide but acquires EEG, allows for re-montaging,
saving and printing of EEG as well as access to NF1 & NF2 add on products. The collection module can be purchased as a stand
alone module (NGA) or as an add on (NC) to Neuroguide.
NF1 is Surface 1 to 19 Channel
Z Score NeurofeedBack ($2,000):
19 Channel Surface EEG Z score biofeedback including average reference, linked ears and
Laplacian real-time Z scores. Real-time, coherence, phase
difference, power,
amplitude asymmetry, phase shift and phase lock
duration Z scores. Includes a
Symptom Check
List and Surface EEG Z Scores
to help structure a biofeedback protocol
design. LORETA Z scores measured during a QEEG analysis are also used to further aid in the development of a neurofeedback protocol.
NF1 also requires the purchase of the acquisition module ($600).
The collection module can be purchased as a stand alone module ($600) or as an
add on to Neuroguide. NF1 & NF2 can also be purchased as a stand alone
program for instances where there are satellite clinics and multiple
Neuroguide's are not needed.
Flash/DVD and other displays
can be purchased from Cybernetic Interface Systems at:
http://www.beyondvr.net/products/cis/index.htm. NeuroGuide currently supports 3D Relief, Kaliedascape
and Starlight with CIS. The Brainmaster multimedia displays
are available for Brainmaster Discovery amplifiers only. Contact Brainmaster at:
www.brainmaster.com. The Deymed 3D
Engine is available, contact us at
qeeg@appliedneuroscience.com.

NF2 is 3-Dimensional LORETA Z Score
Neurofeedback ($2,500): Z Score LORETA biofeedback
of Brodmann areas in the brain,
"Hubs", "Modules" and
"Default Mode Network" and 3-dimensional locations registered to a reference
MRI. The neurofeedback protocol is based on a
Symptom
Check List combined with LORETA Z scores measured during a QEEG analysis to aid in
linking patient's symptoms and complaints to functional specialization in the
brain. NF2 also requires purchasing the Acquisition Module
(AC).



Contact us for more info
|